
Expansion and optimisation
Most older systems lose 10–25% of production to shading, poor stringing or ageing inverters. We bring it back.
When is it worth it?
- Consumption has grown (heat pump, EV, pool) and the system is too small
- A chimney, tree or neighbouring building shades part of the roof
- The inverter is 8–10+ years old or has no monitoring
- You want to add a battery to an existing system
Solutions
Huawei 1100W-P / 1300W-P, SolarEdge and Tigo per-panel optimisers; hybrid inverter upgrade; AC-coupled storage; smart-meter based export limitation; new strings.
Frequently asked questions
Can I add panels to an old system?
Yes, but expansion requires a new DSO application and the added part falls under gross metering – we take that into account in sizing.
Other services
Solar PV installation
From survey to commissioning – residential systems with full grid permitting.
Hybrid and off-grid systems
Battery-backed, grid-independent and backup power systems, single- and three-phase.
Commercial solar
Commercial systems from 50 kW to multi-MW plants, from design to installation.
Heat pumps
Panasonic Aquarea and Daikin Altherma air-to-water heat pumps, designed and installed together with solar.
EV charging
11–22 kW home and commercial charge points with solar-surplus charging and load management.
Request a free survey and an itemised quote.
We look at the roof, the consumption and the tariff scheme – then tell you what makes sense and what does not. No obligation.